TitleProduct

C18150 Copper Chromium Zirconium Rod

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2020-11-28 22:48

  • Browse the number:

    108

Send an inquiries
+
Guangzhou Chang Tong Apparel Co., Ltd.
Contactaixin:

Mr. Kenny(Mr.)  

Email:

telephone:

phone:

Arrea:

Guangdong

Address:

Room 2503, Building C, Yingcheng Garden, Xingangzhong Road, Haizhu District, Guangzhou, Guangdong, China 510310

Website:

http://changtong.medtech-corp.com/

+


C18150 Copper Chromium Zirconium Rod is usually used in the manufacture of various conductive parts, especially for resistance welding parts.

We provide C18150 Copper Chromium Zirconium Rod with diameter of 6 ~ 400mm, and according to different technology and performance requirements, different production processes are adopted, mainly including extrusion, drawing, forging, heat treatment, machining and surface treatment.

At the same time, we have a strict quality management system to ensure the quality of C18150 Copper Chromium Zirconium Rod. During the production process, after the completion of production and before delivery, three independent quality inspections are carried out , and provide the certificate of conformity with the products.



Typical Applications Of C18150 Copper Chromium Zirconium Rod:

Rotor end rings, exciter rails,

Roller electrodes, spot welding electrodes,

Electrode hubs, jaws for flash butt welding systems,

Parts in accelerator systems subject to high electrical and thermal stress,

Ingot moulds for grey cast iron and cast steel,

Cast wheels and continuous casting moulds.


Lead Time:

10~20 days.


Packing And Transport:

Pallets or iron box normally, or as customer's requirements.

Sea Freight, Air Cargo, Express delivery, Land Transportation.


For more details or requirements, please contact us.


Q&A:

1. How is the payment?

TT, LC at sight ,TT+DP are workable.


2.How is the delivery time?

After payment, 10~20days for production, and the shipment is usually 10 ~ 30 days, depend on the receiving place and ship shift.


3. Where is your seaport?

Dalian seaport, near us, less delivery time and costs.


4. How about your after-sales service?

As a professional manufacturer and exporter, we offer promote technology support for all problems and questions. Besides, we accept goods return or replace for quality problem.


http://www.shencopper.com/